RCI Consulting — Building Permit Drawings
Back to Guides & Resources

Full text index · Ontario

Every long-form Ontario permit guide, readable as plain text

RCI Consulting publishes 15 in-depth guides to Ontario building permits — basement second units, garden suites, basement finishing, custom homes and additions, decks, interior renovations, detached garages, and commercial fit-outs for restaurants, offices, schools, retail, salons and mechanic shops, plus HVAC and plumbing drawings. This page gathers all of them into one document: what each permit requires, what the drawings must show, what it costs and the questions clients ask before booking.

15long-form guides
9published prices
5–7days residential drawings
10–15days commercial drawings

Jump to a guide

Residential

Basement Second Units in Ontario

$750 flat drawing package

A legal basement apartment has to satisfy three separate authorities at once: the Ontario Building Code for life safety, the municipal zoning by-law for whether a second unit is permitted on that lot at all, and the electrical and plumbing permits that come with the work. The guide walks through all three in order, because most failed applications fail on the zoning question first and the fire-separation detail second. A second unit is a self-contained dwelling: its own cooking facility, its own bathroom, its own entrance, and a fire separation between floors.

What the drawing set must show

Does the suite need its own hydro meter? Not by the Building Code. Separate metering is a licensing and tenancy question, and some municipalities require it for a registered second unit — the guide flags where that applies so it is settled before construction.

Is a second unit the same as a basement apartment? A basement apartment is one form of it. The permit path is the same whether the unit sits in the basement, above a garage or beside the main house, and the same code rules apply.

Read the full guide: Basement second units in Ontario · Service: Basement second unit drawings

Basement Finishing in Ontario

From $750 starting price

Finishing a basement is the cheapest square footage in the house, and the one project most often built without a permit on the belief that it is "just cosmetic". It is not: new partitions, new plumbing, new circuits and any new sleeping room all trigger a permit, and each one carries a code rule that is expensive to discover after the drywall is up. The guide works through those rules in the order they bite — ceiling height, egress, moisture, then electrical and fire separation.

What the drawing set must show

Can I finish only part of the basement? Yes, and it is a common way to phase a project. The drawings and permit cover what is being built now, provided the layout does not make the later phase non-compliant.

What usually fails inspection? Egress, ceiling height and work done before the permit. Those three account for most of the corrections we see.

Read the full guide: Basement finishing in Ontario · Service: Basement finishing drawings

Garden Suites in Ontario

$1,750 flat, HVAC included

A garden suite is a separate dwelling in the backyard, and it is the most permitting-heavy residential project on this list. It combines a new structure, new servicing, a new address and often a new utility connection, so the file touches zoning, site servicing, structural design and mechanical design together. Many Ontario municipalities now permit garden suites broadly, but the permitted height, footprint and rear-yard setback are set locally and vary a great deal from one city to the next.

What the drawing set must show

Does a garden suite need its own address and utilities? It usually needs its own servicing arrangement and is commonly metered separately. Which of those is required, and by whom, is local, and the guide names the cases.

Can it be built on a lot with a laneway? Yes — a laneway suite is a garden suite that faces the lane. The permit path is the same; the siting rules are not.

Read the full guide: Garden suites in Ontario · Service: Garden suite drawings

Custom Homes & Additions in Ontario

From $1,750 additions; homes quoted

A new house or an addition is where the drawing package stops being a formality and starts carrying real liability: the structure, the envelope and the energy performance all have to be designed, sealed and defensible. Additions add a second layer, because the existing building has to be documented well enough for the reviewer to accept that the new work does not overload it. The guide covers what a permit-ready set contains, where zoning usually caps an addition, and how structural and energy requirements are handled.

What the drawing set must contain

Why is an addition cheaper than a custom home? Scope, not difficulty. An addition starts at the published entry point because the drawing set covers a defined piece of new work; a whole house is quoted per project because the set covers everything.

Do I need an engineer as well as a designer? For most additions and all new houses, part of the structure needs engineering. It is coordinated into the same package rather than left for the contractor to arrange.

Read the full guide: Custom home & addition drawings in Ontario · Service: Custom home & addition drawings

A deck is the structure you cannot see, which is why so many of them fail inspection or, worse, fail quietly. In Ontario most decks above a certain height, and any deck attached to the house, require a building permit before construction starts. The review looks at four things: the footings, the beams, the connection to the house, and the guards. The guide explains what each of those has to show and where zoning, rather than structure, decides the size.

What the drawing set must show

Do I need a permit to replace an existing deck? If the size, height or structure changes, usually yes. A like-for-like surface replacement may not need one, and the guide explains how to tell.

Can a roof be added over an existing deck? Yes, but the deck's structure and footings have to be checked for the added load, and upgraded where they cannot carry it.

Read the full guide: Deck and porch permits in Ontario · Service: Deck & porch drawings

Interior Renovation Permits in Ontario

From $1,750 starting price

Removing a wall to open up a main floor looks like a cosmetic change and is structurally the most consequential thing most homeowners ever do. Once a load-bearing wall is gone, the load it carried has to go somewhere: a beam, columns, new footings, and a continuous path down to the foundation. The guide covers how that load path is designed, when a permit is triggered, and why a contractor's opinion is not a substitute for drawings.

What the drawing set must show

Is a permit needed to remove a non-load-bearing wall? Often not, but "non-load-bearing" has to be established rather than assumed, and any electrical or plumbing inside that wall brings a permit with it.

Can the beam be sized on site? Not legitimately. The beam is the part of the renovation that keeps the house standing, and it is designed and shown on the drawings.

Read the full guide: Interior renovation permits in Ontario · Service: Interior alteration drawings

A detached garage is a simple building with a strict site: on most lots the limit is not the structure but the by-law. Lot coverage, rear and side setbacks, and the height limit decide the footprint before a single wall is drawn, and a garage that exceeds coverage is refused regardless of how well it is built. The guide covers that zoning check first, then foundation, framing and electrical.

What the drawing set must show

Can the garage be taller to add a loft? Only within the height limit for an accessory building in that zone, and the loft changes the structure, so it is designed in from the start.

Does a garage conversion need a different permit? Yes — converting it to living space is a change of use with insulation, egress and heating requirements, not a garage permit.

Read the full guide: Detached garage drawings in Ontario · Service: Detached garage drawings

Mechanical

HVAC Permit Drawings in Ontario

From $750 residential

Mechanical drawings are required whenever the work changes the heating, ventilation or exhaust system of a building — a new furnace or heat pump, a ducted addition, a commercial kitchen hood, a make-up air unit, or the ventilation for a new dwelling unit. They are also the drawings that arrive last and delay the most files. The guide explains when mechanical drawings are required, what a reviewer expects to see on them, and why a BCIN-qualified designer matters here as much as on the architectural set.

What the drawing set must show

Is an HVAC drawing needed for a like-for-like furnace swap? Usually not, if capacity and routing are unchanged. Once capacity, fuel or routing changes, the mechanical permit follows.

Why do mechanical drawings hold up so many files? Because they are prepared separately from the architectural set and arrive after submission. Here they are coordinated into one package.

Read the full guide: HVAC permit drawings in Ontario · Service: HVAC drawings

Plumbing Permit Drawings in Ontario

From $750 residential

Plumbing is the one trade where the drawings and the inspection are almost the same document: the reviewer wants to see pipe sizes, slopes, vents and fixture units, and the inspector checks that what was built matches. The guide covers when plumbing drawings are required, how a drain-waste-vent system is laid out, and what changes for a commercial space where backflow prevention and larger fixture loads come into play.

What the drawing set must show

Does a basement bathroom need a plumbing permit? Yes, and it belongs in the same drawing set as the rest of the basement work so it is reviewed once rather than twice.

Can existing drains be reused? Frequently, but the capacity and venting have to be checked against the new fixture load before it is designed that way.

Read the full guide: Plumbing permit drawings in Ontario · Service: Plumbing drawings

Commercial

Opening a restaurant means satisfying three authorities at once — building, fire and the local health unit — and the kitchen is where the three collide. A commercial kitchen ventilation system has to be sized to the cooking equipment, the grease handling has to satisfy the health unit, and the dining layout has to satisfy egress and occupancy. The guide covers how those requirements are coordinated into one package, and why a change of use is often the real permit.

What the drawing set must show

What if the space was a retail unit? That is a change of use, and it brings new occupancy and code requirements with it. It is assessed before the lease is signed, not after.

Can a patio be added later? Yes. Patio and outdoor dining areas are drawn to meet egress, accessibility and zoning requirements, and are best designed with the interior layout rather than after it.

Read the full guide: Restaurant permit drawings in Ontario · Service: Restaurant drawings

An office fit-out or tenant improvement is judged on four things: how people get out, whether everyone can use the space, whether the mechanical system still serves the new layout, and whether the electrical distribution reaches the new desks. The guide covers those four, plus the base-building coordination that decides how much of the work has to go back to the landlord and the building engineer before anything is submitted.

What the drawing set must show

Does a small office renovation need a permit? Usually yes, once partitions, exits, mechanical or electrical distribution change, because each of those touches a code requirement.

Who approves the base-building changes? The landlord and the building's engineer, in parallel with the municipality. That coordination is part of the drawing work, not a separate favour.

Read the full guide: Office fit-out permits in Ontario · Service: Office fit-out drawings

Educational buildings carry the strictest life-safety requirements of any occupancy type on this list: occupant load is high, the occupants are children, and the review is done by a building department that knows the type well. On top of the Building Code, school work usually answers to a board's own design standards. The guide covers the life-safety analysis, accessibility and mechanical scope a school renovation file is expected to contain.

What the drawing set must show

Why do school files take longer? More disciplines review them and the life-safety analysis has to be complete before the first submission. The drawing work is longer for the same reason.

Can work be phased over a summer? Yes, and it is normal. Phasing is designed into the drawings so each stage is separately approvable and inspectable.

Read the full guide: School renovation permits in Ontario · Service: School renovation drawings

In retail, the trigger is rarely the construction and almost always the change of use or the occupant load. Taking over a unit that was something else means the space has to be reassessed against what it will now hold: how many people, how they exit, whether they can get in with a stroller or a wheelchair. The guide covers that reassessment, plus the storefront and signage work that comes with a fit-out.

What the drawing set must show

Is cosmetic work exempt? Often, until it changes exits, occupancy or accessibility. Those three decide more retail files than finishes do.

Does signage need a separate approval? Sign permits are a municipal process of their own, and the drawings are prepared so both applications agree.

Read the full guide: Retail fit-out permits in Ontario · Service: Retail space drawings

Salon & Spa Permits in Ontario

Quoted per project

A salon or spa looks like a retail fit-out and permits like a light industrial one. Wash basins, chemical exhaust, dryers, steam and heavy electrical loads turn a familiar-looking space into a mechanical and plumbing problem, and the local health unit also has a say in how the premises is laid out. The guide covers those trades in the order they constrain the layout.

What the drawing set must show

What separates a salon file from a retail one? The plumbing and exhaust. Wash basins and chemical exhaust are what the review actually turns on.

Can equipment change after design? It can, but each change adjusts the load and the exhaust, so equipment is confirmed early rather than during construction.

Read the full guide: Salon and spa permits in Ontario · Service: Salon & spa drawings

An automotive shop is a building designed around vehicles: heavy floor loads, exhaust extraction at the tailpipe, oil and fluid containment, and fire separation from anything combustible next door. Those are structural, mechanical and environmental questions that the building department reviews together, and they are cheapest to answer on paper. The guide covers what a shop permit file has to demonstrate.

What the drawing set must show

Does adding a hoist change the permit? Yes. It changes the structural design and the load on the slab, so it is designed with the building rather than added later.

Is a shop permitted in a retail plaza? Sometimes, subject to zoning and to the fire separation the occupancy requires. That check comes before design.

Read the full guide: Mechanic shop drawings in Ontario · Service: Mechanic shop drawings

What the drawing packages cost

Every figure below is the same price published on the matching service page and in that page's structured data. All amounts are in Canadian dollars and cover the drawing package only — municipal permit fees and construction are separate.

Guide Price (CAD) Pricing basis Page
Basement Second Unit$750Flat — separate entrance quoted on its ownView
Garden Suite$1,750Flat — HVAC design includedView
Basement Finishing$750Starting fromView
Custom Homes & Additions$1,750Starting from — larger custom homes quoted per projectView
Decks & Porches$900FlatView
Interior Alteration & Renovation$1,750Starting fromView
Detached Garage$900FlatView
HVAC$750Starting from — residentialView
Plumbing$750Starting from — residentialView
Restaurants, Office Space, Schools, Retail Space, Spa & Hair Salons, Mechanic ShopQuoted per projectFree consultation, then a written quoteView

Terms that apply to every guide

These are the same terms published on the service pages and in the site's business data. They are repeated here because they answer most of the questions a guide raises.

Questions that apply across all 15 guides

The answers below are the same ones published on the FAQ page and on Guides & Resources.

Do these guides apply to my municipality?

Mostly yes, with one caveat. The Ontario Building Code applies province-wide, so the code requirements in every guide — egress, fire separation, structural loads, ventilation — read the same whether you are in Toronto, Mississauga, Ottawa or Barrie. Zoning, setbacks, height limits and submission standards are set by each municipality instead, which is why the guides flag the local rules that vary. We design to the specific building department reviewing your file rather than sending a generic package that gets bounced back.

Are the costs in the guides current?

The figures are typical Ontario ranges for the project type described, and the package prices in the table above are our own published fees, not third-party estimates. Ranges shift with material costs and municipal fees, so treat them as a planning budget rather than a quote. Send us your project and we will confirm the exact number for your scope.

Do I need a BCIN-certified designer to submit drawings?

For most building permit applications in Ontario, drawings must be prepared by a qualified designer — that is what a Building Code Identification Number (BCIN) certifies. A homeowner can file the application, but the drawings generally still have to come from a BCIN-qualified person for the parts of the code the project touches. RCI Consulting is a BCIN certified firm, which is why our drawing packages can be submitted directly to the building department.

How long does a permit take once the drawings are ready?

The drawing work is the part we control; the review clock belongs to the municipality. Standard residential reviews are usually measured in weeks and commercial fit-outs often take longer because they involve zoning, fire and sometimes health approvals. The review time also stops while the reviewer waits on answers, so a complete, coordinated package is the single biggest lever on your timeline. We can tell you the typical window for your specific municipality when you book a consultation.

Is a guide enough, or do I also need project-specific drawings?

The guides tell you what applies to your type of project and roughly what it costs — they are not a drawing set. Every permit submission needs drawings dimensioned to your actual property, existing conditions and proposed scope, reviewed and sealed by a qualified designer. Use a guide to plan and budget, then book a site visit so the drawings are built on real measurements.

Talk to the office

RCI Consulting
4030 Sheppard Ave E, Scarborough, ON M1S 1S6, Canada
Telephone +1-416-545-9336 · Email info@rciconsulting.ca
Office hours Monday to Friday, 9:00 AM to 5:00 PM. Site visits Monday to Saturday, 9:00 AM to 6:00 PM, by appointment.

Request a free consultation · Browse the guides hub · See the 15 services · Where we work